人妻系列免费观看_潮喷99在线观看_a级片在线免费观看视频_狠狠躁天天躁中文字幕日韩版

2018

Order forklift truck on Jan. 4.
On February 5, the ISO 9001 quality management system, ISO 14001 environmental management system and OHSAS 18001 occupational health and safety management system passed the annual review.
Order workshop environmental protection flue gas purifier equipment on March 22.
The production safety license passed the annual inspection on April 11.
Order portable welding machine on May 2.
On June 29, the contracting and design qualification of membrane structure project passed the annual inspection.

2017

Order two piston machines on March 28.
Ordering a rail welding machine on April 10 will further improve the production efficiency and the processing quality of large-scale monomer projects.
Order a pipe bender on August 25.
On September 15, two high frequency welding machines were ordered, and the production efficiency was further improved.
Order gas shielded welding machine on December 21.
Order Hot Knife Cutting Machine on December 26.

2016

Order portable welding machine on Jan. 11.
On November 28, one high frequency welding machine and one PTFE welding machine were ordered, and the production efficiency was further improved.
Order PTFE portable welding equipment on December 2.
On December 19, construction personnel completed the replacement of certificates one after another.

2015

On March 18, the production efficiency was further improved by ordering rotary grinding equipment, porous cold punching machine and punch press press equipment.
The new version of the company's website was launched on March 30.
The second train was ordered on April 6 to improve the efficiency of steel structure workshop.
On May 8, the membrane structure of the workshop corridor was completed, which increased the available area of the factory.
On May 18, the company received five certificates of membership.
July 26 was awarded the National Qualification Certificate of Construction Cost Staff.
Membrane structure design and contracting qualifications were obtained on August 1.
On Nov. 17, he was awarded the second-level qualification of professional contracting for construction of architectural decoration and decoration projects.
The company increased its capital to 30 million on December 9.

2014
On Jan. 9, we stayed at 699 Caosheng Road new factory building to ensure the company's development and capacity requirements.
On March 14, we ordered membrane stress dynamometer, elongation tester and illuminator to test each batch of membrane materials, so as to effectively control the quality of the project.
On March 24, we ordered a pipe bender with a maximum diameter of 420, thus ending the pipe bending cooperation.
The new office decoration was officially launched on April 28.
Order ETFE processing equipment on July 5.
The final draft of the new sample design for the 2014 edition was finalized and the website was revised on September 18.
Order a high frequency welding machine on September 25.
To further provide professional and technical level, two first-level project managers and six second-level project managers of membrane structure engineering were registered as professional qualifications by participating in the association's training and learning for their specialty.
2013
On August 27, the purchase contract for track PTFE equipment was signed, and the processing quality of large monomer PTFE film was guaranteed.
On October 8, the new plant was formally renovated for pre-occupancy preparation.
On October 20, the contract for ordering automatic cutting machine for membrane material was signed, the processing capacity of membrane material was further improved, and the defects of low efficiency and accuracy of manual lofting were thoroughly solved.
On November 23, the order contract for 12-meter track CNC cutting machine was signed, and the manual lofting and cutting were ended.
On December 31, the quality of intersecting line groove was guaranteed by ordering intersecting line, cutting machine and driving vehicle, and the manual lofting was ended.
2012
In order to further improve the management and quality control level of the company, ISO quality certification training was conducted and ISO quality system certification was obtained.
Obtain qualification of steel structure and decoration.
Obtain a production safety license.
With the joint efforts of nine colleagues in sales department, 87 contracts were signed and project cooperation with Shanghai Construction Machinery, Shanghai Landscape Group, Beijing Metallurgical Corporation of China and China Shipbuilding Heavy Industry Group was carried out, with good quality recognition and reputation.
The roof project of the first tallest building of the Chamber of Commerce in Xinxiang, Henan Province is constructed. The construction height of the membrane structure project is 108 meters.
The division of labor among departments has been further detailed, staffing has been improved and management level has been effectively improved.
2011
On February 15, an order contract for vertical PTFE film hot-closing machine was signed.
The company has won the honorary certificate of 10 top enterprises in quality and safety demonstration unit and national membrane structure engineering professional contracting.
Obtained the engineering design and contract certificate of membrane structure enterprise.
Require company employees to apply for relevant professional studies to prepare for applying for steel structure qualification and safety production license.
Admission to the new office on November 18.
2010
On February 15, the company stayed in No. 29 new factory building of Lixin Road, equipped with steel structure workshop and membrane workshop, and adjusted workshop director, project manager and processing and installation team personnel.
On March 14, the high frequency welding machine for membrane materials was ordered to enter the workshop.
On August 11, based on the original design software, the company re-ordered the original 3D 3S software.
On September 8, we ordered several hot knife cutting machines, high frequency welding machines for membrane materials, gas-shielded welding machines and portable welding machines for membrane materials.
On October 18, the high frequency welding machine for membrane material was ordered again to enter the factory building.
On November 15, a new office was purchased in Jiangqiao Town, Jiading District.
2009

Basic hardware and software equipment, the number of contracts signed by 49 personnel recruitment, and China Construction Bureau and Pudong Binjiang Group to complete the World Expo project.

2008

The company was founded, ordered design software, recruited personnel from various departments, signed 20 contracts. The work address is set at Room 1101, Building 3, Lane 2890, Jinshajiang Road, and the production and processing location is set at No. 235, Baian Road.